Tuesday 15 May 2012

New project 15/05/12

                                                 Block work for waterfall and stream
                                        Tom levelling the ground for the foundations for the pavillion
                                        Concrete collar to support the liner on the bottom pond
                           Land drain about to go under the pond to prevent upward hydrostatic pressure
                                                            Harry checking the levels
Pictures of the start of our current project in Bolton......more to follow as the pond takes shape, it may not look much at the moment but this is only the block work and foundations to support the liner

No comments:

Post a Comment